Shyam Ferro Alloys Ltd. has adopted
the most acceptable quality
systems right from the Raw
Material feeding to the furnace to
finished product handling. Raw
Material feeding is consists of
inspection and quality control
followed by Lab reports on
various raw materials based on
IS 1473-1960 amendment for
Manganese Ores and other IS
Amendments for reluctant
and fluxes. After ensuring
these reports by process
metallurgists the raw materials
inspection will be conducted
by verifying physical and
chemical characteristics prior
to feeding into the furnace
through batch weighing system.
After getting the desired end
product called the finished product
i.e.,High Carbon Ferro Manganese
metal, it will be once again
tested in the laboratory for
inspection and quality control
measures . This will be
carried out within 2 to 3
hours interval by taking hot
samples of the end product and
verified for its chemical
specifications and these test
reports will be given to process
metallurgists for taking corrective
measures if required. The Hot molten
metal is collected in casting
pans instead of sand pockets
contamination further slag is
systematically removed in molten
stage itself to avoid slag
mixing in the pure metal.
The finished product
confirms to customers
required sized and stacked
in specified stockyards size
wise in respective platforms and
yards.
|
|